| Project: Covered Bridge Stone Steps Project |
The Dummerston Conservation Commission successfully completed the
“Steps Project” during the summer and fall of 2005. With support from
the Connecticut River Joint Commission and volunteers from the
Dummerston community we replaced a badly eroded trail with attractive
limestone steps that lead to a popular swimming hole. The steps were
put to use as soon as they were finished, with swimmers-to-be remarking
how much more pleasant and safer it was to walk down the steps rather
than the rooted eroded trail. The parking area has been resurfaced as a
result of a cooperative venture between VTrans and the Dummerston road
crew so that rainwater now drains away from the steps and into a proper
drainage system. In addition to the steps, we planted grass seed along
the eroded bank and then covered it with erosion blankets; hopefully
grass will take root next spring. |